First Previous Next Last Index Home Text

Slide 13 of 23

Notebooks are collected every 4 or 5 weeks according to the school grade periods. Grade sheets will be placed in the notebook showing my evaluation of your work. A core of 5 on a project means you were doing good. A score of 4 means you followed the assignment but the quality of the work was bellow standard. A score of three means you did the assignment but could do better quality work in the future. Scores of 2 or 1 mean you misssed requirements of the assignment and or quality was low. No assigment will get less than a 1. A score of 0 on the grade report means the project was not tutned in on time or at all. Late assignments from one grade period may be made up in a second grade period as long as work is done by the final grade deadline. Late projects get a maximum of 4 points.